MARCH 2021

Sunday, March 28 – Saturday, April 3, 2021 

Scheduled activity is weather permitting 

Sunday, March 28

  • No construction activity scheduled.

Monday, March 29 – Friday, April 2

  • Install foundations and conduit from Irving Street to Lamont Street NW.

  • Install PVC at Columbia Road/Harvard Street/Mt. Pleasant Street NW.

  • Check existing conduits around intersections of 16th Street to see if there were any blockages.

  • Relocate CCTV at Irving Street NW.

  • Relocate four pedestrian signals on the corner of 16th Street and Park Road NW.

  • Please note: There were intermittent lane closures during this week at various locations (see up-to-date traffic advisories by clicking here). 

 Saturday, April 3

  • No construction activity scheduled.

Sunday, March 21 – Saturday, March 27, 2021 

Scheduled activity is weather permitting 

Sunday, March 21

  • No construction activity scheduled.

Monday, March 22 – Friday, March 26

  • Relocate CCTV at Irving Street NW.

  • Installed electrical cable.

  • Check existing conduits around intersections of 16th Street to see if there were any blockages.

  • Work on wheelchair ramps, excavate and backfill, install standard double/single basins, install PVC and push button and standard pole bases at Columbia Road/Harvard Street/Mt. Pleasant Street NW.

  • Please note: There were intermittent lane closures during this week at various locations (see up-to-date traffic advisories by clicking here). 

 Saturday, March 27 

  • No construction activity scheduled.

Sunday, March 14 – Saturday, March 20, 2021 

Scheduled activity is weather permitting 

Sunday, March 14

  • No construction activity scheduled.

Monday, March 15 – Friday, March 19

  • Excavated and placed concrete for the wheelchair ramp at the northeast corner 16th Street and Harvard Street NW.

  • Placed gutter at the wheelchair ramp, restored stone curb, placed aggregate base course (GAB) material to backfill the electrical duct bank, and encased electrical conduit at 3360 16th Street and 3426 16 Street NW.

  • Excavated electrical conduit and the blank out foundation at the southwest corner of Harvard Street and Mt. Pleasant Street NW.

  • Relocated existing traffic signal pole to the temporary base on the traffic median at Mt. Pleasant Street and Harvard Street NW.

  • Checked existing conduits around the intersection of 16th Street and Park Road as well as 16th and Lamont Street NW to see if there were any blockages.

  • Installed PVC encased electrical conduit between manholes and pole foundations at Newton Street NW, Meridian Place NW, the southwest corner of Mt. Pleasant Street, and north of Irving Street NW.

  • Relocated 4 existing 3-section traffic signal heads at 16th Street and Mt. Pleasant Street NW as well as at Mt. Pleasant Street and Harvard Street NW.

  • Removed a 3-section traffic signal head from the southwest corner of 16th Street and Columbia Road NW.

  • Installed two transformer bases for blank out signs.

  • Installed manholes at Mt. Pleasant Street and Harvard Street.

  • Placed PVC electric conduit and light foundation at Mt. Pleasant Street and Harvard Street NW.

  • Excavated standard double basin and abandoned basin connecting pipe at southbound 16th Street and Columbia Road NW. 

  • Please note: There were intermittent lane closures during this week at various locations (see up-to-date traffic advisories by clicking here). 

 Saturday, March 20 

  • No construction activity scheduled.

Sunday, March 7 – Saturday, March 13, 2021 

Scheduled activity is weather permitting 

Sunday, March 7

  • No construction activity scheduled.

Monday, March 8 – Friday, March 12

  • Installation of PVC across 16th Street at Oak Street NW.

  • Installation of PVC, pole bases, PCC foundation for traffic signal/pendant post street light pole, and conduit/duct bank piping for electrical sign wiring in the block of Newton Street to Monroe Street NW.

  • Excavation at Columbia Road/Harvard Street NW.

  • Installation of a double basin, push button pole base, PCC foundation for traffic signal/pendant post, and PVC at Columbia Road/Harvard Street NW.

 Saturday, March 13 

  • No construction activity scheduled.

Sunday, February 28 – Saturday, March 6, 2021 

Scheduled activity is weather permitting 

Monday, March 1 – Friday, March 5 

  • Backfilling of the trench at Arkansas Avenue NW.

  • Installation of pole base at of Arkansas Avenue NW, Spring Road NW and Oak Street NW.

  • Installation of PVC across 16th Street at Oak Street NW.

  • Installation of PCC Foundation for traffic signal/pendant post street light pole at Oak Street NW.

  • Excavation at Columbia Road/Harvard Street NW.

  • Installation of duct bank across 16th Street NW at Spring Road NW.

  • Installation of light pole foundations at Spring Road NW.

 

Saturday, March 6

  • No construction activity scheduled.